Trinity
Church presented a unique planning and design opportunity
because of the long, narrow shape of the site (almost
1/4 mile long). The multi-use facility already existed
when DDR became involved with the project. The immediate
priority was a new, 20,000 square foot Christian Education
addition linked directly to the existing facility.
The long term priority,however, was a future 1,200-1,400
seat Worship Center with parking located within a
reasonable walking distance. To achieve this objective,
the Worship Center needed to be in the center of this
linear site.
|
|
|
|
|